Tulane Home Tulane Shield logo linking to site home page
Close

Summer Maintenance/Memorial Day Closure

The Reily Student Recreation Center will be closed Saturday, May 27-Sunday, June 4, for summer maintenance.

The Tulane Fitness Center will be open during this time. As a reminder, the Tulane Fitness Center is only accessible to Tulane faculty, staff, and students with a valid Splash Card and a Tulane Campus Recreation membership. However, please note that the TU Fit will be closed Monday, May 29, for Memorial Day. 

The Reily Center will resume its hours of operation and group fitness schedule starting Monday, June 5.

Aquatics

Former Natatorium Photo

Current Construction

Pool Renovation Update

Renovations of the natatorium and social pool within the Reily Student Recreation Center at Tulane University are well underway, with an anticipated opening this calendar year.

The scope of this project includes upgrades for the natatorium, including a new pool deck, new steps and ledges for ease of entry, and the integration of Tulane brand colors throughout. Additionally, the existing concrete pool will be upgraded with a state-of-the-art Myrtha liner system, consisting of stainless-steel panels laminated with waterproof PVC coating.  

The ability to provide programming for multiple activities, will be made possible by the installation of a new, moveable fiberglass Stark bulkhead. Mechanical and electrical systems are also being significantly upgraded, including new air returns and humidity controls, new lighting, as well as all-new pool piping, water filtration equipment, and other system upgrades.  

The social pool is also receiving upgrades, including pool resurfacing, tile work and depth markers, light fixtures, and a new waterproofing system.   

The design team consists of Grace Hebert Curtis (Architects), Lemoine Company (Contractors), Schrenk Endom Flanagan Engineers (Structural Consultant), Huseman Engineers (MEP consultant)  and Councilman Hunsaker (Aquatics consultant).